Tubao, fabricant français de buses métalliques galvanisées & de bassins Weholite PEHD
  • Completed projects
  • fr
  • en
TubaoTubaoTubaoTubao
  • Overview
    • About us
    • History
    • Our team
  • Expertise
    • Tubao Engineering
    • Tubao Technology
    • Tubao Logistics
    • Tubao Care
  • Tubao
    • Metallic Tubes
    • Tubao Solutions
      • Accessible stormwater basins
      • Accessible infiltration basins and wells
      • Rainwater recovery
      • Accessible Fire Fighting Reservoirs
      • Lifting stations
      • Flow Regulators
      • Storm sewer
      • Underpasses and Overpasses
      • Culverts
      • Underground shelters
      • Wind Turbine Foundation Formwork
      • Worksite optimization
      • Filtrao®
  • Weholite
    • HDPE tubes
    • Weholite Solutions
      • Purification
      • Drinking Water
      • Industry and agriculture
      • Gravity-driven sewers
      • Flat panels
  • Contact

Tubao Logistics

Tubao delivery and unloading

Tubao LogisticsTubao LogisticsTubao LogisticsTubao LogisticsTubao LogisticsTubao LogisticsTubao Logistics

Integrated logistics department

Equipped with an integrated logistics department, we handle shipping and unloading of our tubes depending on the department.

Our trailer trucks are equipped with a crane to carry out auto-unloading of basins when the location is suited for it. The expertise and professionalism of our crane operators ensure easy setup and safe unloading. Deliveries are spaced out and optimized.
Since 2014, Tubao has been using a 24-meter fixed-tower crane at its Pucheuil production site in Saint-Saëns. With a span of 70 meters capable of hoisting a maximum of 12 tons, this a warehousing machine optimizes moving tubes from the production table to the production lines, to storage areas and loading onto the trucks. A real boost in productivity and safety guaranteed !

Interested in our rainwater management solution?

REQUEST A STUDY


Z.A du Pucheuil | 76680 Saint-Saëns




© 2017-2022 TUBAO SAS | Conception : Imaginactif | Mentions légales | Politique de confidentialité
  • Overview
    • About us
    • History
    • Our team
  • Expertise
    • Tubao Engineering
    • Tubao Technology
    • Tubao Logistics
    • Tubao Care
  • Tubao
    • Metallic Tubes
    • Tubao Solutions
      • Accessible stormwater basins
      • Accessible infiltration basins and wells
      • Rainwater recovery
      • Accessible Fire Fighting Reservoirs
      • Lifting stations
      • Flow Regulators
      • Storm sewer
      • Underpasses and Overpasses
      • Culverts
      • Underground shelters
      • Wind Turbine Foundation Formwork
      • Worksite optimization
      • Filtrao®
  • Weholite
    • HDPE tubes
    • Weholite Solutions
      • Purification
      • Drinking Water
      • Industry and agriculture
      • Gravity-driven sewers
      • Flat panels
  • Contact
Tubao
  • frFrench
  • enEnglish